The size of your development will have an impact on the validation requirements you need to submit to us.
Small development
For developments that have less than 250 square metres of newly created drained surfaces, no flow restriction or on site attenuation is needed. This is only if the relevant sewer authority agree after your pre-planning sewer enquiry.
The site should be drained with separate systems in accordance with Building Regulations. Find
more information on Building Regulations on the Planning Portal.
external link.
You will need approval for any new connection to the public sewer through the Section 106 Water Industry Act 1990 Application from the relevant sewer owner, for example Yorkshire Water.
If your development includes a front garden or driveway you should consider our
front garden design guidance.
You could also include some additional Sustainable urban Drainage (SuDS) features to help reduce the volume of surface water runoff from your site.
Contact us for further guidance.
Minor development
This means:
- 1 to 9 dwellings, less than 0.5 hectre
- office, industrial and retail under 1 hectre
- gypsy and traveller site with up to 9 pitches
- any other non-residential development or building under 1000 square metres
Major development
This means:
- 10 or more dwellings
- office, industrial and retail over 1 hectre
- gypsy and traveller sites with 10 or more pitches
- any other non-residential building or development over 1000 square metres